This 1200 MW (6 x 200MW) project is one of the largest hydro-electric projects in India with 800m head. The project on completion will generate 5183 Gwh in 90% dependable year.

The main components of the project are:

  • 60 M high Concrete Faced Rockfill Dam (CFRD) 400 M downstream of the confluence of rivers Lachen Chu and Lachung Chu near village Chungthang.
  • 2 Nos. Intake Tunnels of 6 M diameter.
  • 2 Nos. Desilting Chambers of size 16 M x 21.2 M x 287 M to separate silt particles of more than 0.2 mm size.
  • 13.325 KM long Head Race Tunnel of 7.5 M diameter (horse-shoe shape) with design discharge of 175 cumecs.
  • 121 M high Surge Shaft of 20 M diameter.
  • 2 Nos. 1135 M long Pressure Shafts of 4.0 M diameter each plus bifurcations.
  • Underground Power House of 21.5 M x 46 M x 220.5 M for housing 6 units of 200MW each vertical shaft pelton wheel turbines.
  • 980 M long D-shaped Tail Race Tunnel of 8.0 M x 8.0 M size.

The pre-construction stage investigation works viz. sub-surface drilling, drifting, topographical surveys and geological mapping for the Project have been completed and the results from these are being utilized in the detailed engineering for the Project. The project has obtained all the statutory clearances and works have been started at the site. The project is scheduled to be commissioned within the XIth Five Year Plan.

Unique Features of the Project

  • Teesta Stage III is the largest HE Project under construction in Joint Sector in the country.
  • Best and most unique HE Project with high head of 800 m against short HRT length of 13.3 km.
  • Best studied and investigated project in the country by agencies like CWC/CEA, GSI, NHPC and TUL.
  • Most dependable hydrology with data of over 30 years period for arriving at the dependable flow.
  • Environment friendly project – Major project components underground, minimum impact on environment.
  • Despite the size of the project no Resettlement and Rehabilitation issues leading to no local/ R & R issues
  • Sikkim is politically most stable, peaceful and investor friendly state
  • Govt. of Sikkim has 26% Equity resulting in pro-active attitude of the Government and smooth implementation of the Project
  • Local people are pro-development leading to smooth implementation of the project
  • Less implementation time as most of the infrastructure works are in place.


 

 