Teesta
Urja Limited has been incorporated as a 'Special Purpose Vehicle'
(SPV) for the development of Teesta Stage-III H.E.P
The power
generation potential of the Teesta Basin is estimated 7046 MW
of which only 510 MW is presently under development. Thus, majority
potential of the basin is yet to be harnessed.
The power
potential of Teesta river itself is planned to be harnessed through
a cascade of six hydro projects and the third stage of this cascade
is the 1200 MW, Teesta – Stage III hydro electric project
- the biggest of the six schemes.
Implementation
of the 1200 MW Teesta – Stage III H.E.P has been entrusted
to “Teesta Urja Limited” (TUL) by Govt. of Sikkim
on July18, 2005.
|